This five-story, 168,000-square-foot outpatient facility on Jamboree Road will offer adult and pediatric specialty care, urgent care, digestive health, neurosciences and comprehensive laboratory and radiology imaging services in one convenient location. An outdoor garden and café will enhance the patient and visitor experience.

This building also will be the new home of the Center for Autism & Neurodevelopmental Disorders, providing hope and help to individuals living with autism spectrum disorders, attention-deficit/hyperactivity disorder and other neurodevelopmental disorders.

Size: 412,950 s.f.

Construction Update as of 10/03/2023:

  • MOB:
    • Temporary cooling units have been removed.
    • Air handling Unit is operational and conditioned air is flowing.
    • Roof installation of framing for roof screen.
    • Prime and painting of Stair #1.
    • Installation of casework Levels #3 and #5.
    • Installation of south main entrance storefront.
    • Installation of flooring and ACT ceiling at the main lobbies.
    • Level 2 Choc buildout drywall and tapping.
    • Flooring prep and installation, door installation, drywall and tapping.
  • Parking Structure:
    • Elevator construction sign-off.
    • Removal of manlift and prep for concrete pour back of concrete spandrels.
    • Installation of Exterior Façade Perforated Panels North Elevation.
  • Site:
    • Installation of storm drain laterals - south and north of Parking Structure.
    • Chlorinate and Flush: Complete fire water and domestic water loops.
    • East of MOB - form, pour curb and gutter.
    • Install wetlands at NE and NW Ends.
    • Joint Use Trail:
      • Grading, form, pour of curb and gutter for FM driveway to Campus Drive.
      • Excavate, drill and pour light pole footings - Fairchild to West entrance.

Construction Photos


Project Details

Project Manager: Saman Mahmood
Design & Construction Team
Gen. Contractor: McCarthy Builders
Architect: Smith Group
Struct. Eng.: KPFF
Civil Eng.: KPFF
Mech./Plumbing Eng.: P2S, Inc
Electrical Eng.: P2S, Inc
Landscape Architect: Smith Group
Parking Structure Architect: International Parking Design
Parking Structure Struct. Eng.: Ficcadenti Waggoner & Castle
Sub-Contractors
Electrical: Berg Electric Group
Plumbing: Murray Company
Elevators: Otis
Drywall/Metal Studs/Plaster: Nevell Group, Inc.
Fire Protection: Kimble & Company
Mechanical: Murray Company
Earthwork: Sharma General Engineering Contractors
Building Enclosure: Clark Pacific